Skip to main content
Aoba Administrative Law Office
A tidy industrial-waste collection and transportation yard.

Industrial Waste Collection & Transportation

Permits to collect and transport industrial waste (without transshipment or storage) for other companies. Over 200 cases handled across the Kanto region, with same-day start and a full refund if the permit is denied.

  • Same-day start

    We begin document preparation the day you call.

  • Kanto-wide coverage

    One metropolis and six prefectures; simultaneous multi-authority filings.

  • Full refund if denied

    Unless the application contained a false declaration, our fee is fully refunded.

Overview

What we handle

A permit is required whenever you transport, for a fee, industrial waste generated by another company. We cover the permit from the first requirement check through to ongoing management after it is granted.

  • New permits

    New industrial waste collection & transportation permits. We start preparing documents the day you call and typically reach the permit in 45–90 days.

  • Renewal permits

    Renewals every five years, including re-taking the required training course, managed to the deadline so your licence never lapses.

  • Scope & category amendments

    Adding waste categories or updating registered items through amendment permits or change notifications, depending on the change.

  • Multi-prefecture applications

    Coordinated filings across Tokyo, Kanagawa and the wider Kanto region (one metropolis and six prefectures) in a single project.

  • Change notifications & ongoing management

    Vehicle changes (within 10 days), officer changes (within 30 days) and five-year renewal deadlines tracked on your behalf.

  • Post-permit setup

    Vehicle marking to Ministry of the Environment guidelines and support with your first manifest (control ticket) operation.

Our professional fee starts at ¥100,000 (excl. tax) per authority for a new, renewal or scope-change application (without transshipment / storage). Statutory fees (¥81,000 for a new permit, ¥73,000 for a renewal, as representative examples) and actual costs apply separately. See the fees page for details.

Full details in Japanese

This page is an English summary. The full Japanese page covers the process step by step, the fee table, required documents, anonymised case studies and a detailed FAQ. You are welcome to read it with your browser’s translation, or simply contact us for an English consultation on this matter.

View the full page (Japanese)

Ready to get started?

Tell us your business outline and we will tell you, on the spot, whether the permit is likely to be granted. The first consultation is free.

Industrial Waste Collection & Transportation | Aoba Administrative Law Office